    Biological remediation was used to treat the 800,000 tonnes of soil removed from the stadium site to the base of the Olympic village



    The stadium will be a hybrid structure of permanent and demountable elements

    1. Demountable fabric roof canopy
    2. Demountable wraparound video screen
    3. Demountable upper tier of 55,000 seats
    4. Permanent lower tier of 25,000 seats on concrete structure
    5. Permanent semi-basement of athletes’ changing rooms
    6. Demountable retail pods

     

     